Cladding Remediation
Latitude 52
This case study highlights Lawray’s role in the refurbishment of Latitude 52 in Plymouth, where a heritage residential building was upgraded to meet modern safety and performance standards. Working alongside Lancer Scott, the project balances compliance, durability, and design integrity, ensuring the building is both futureproof and true to its original character.
Contract
Traditional
Location
Plymouth
Project Overview
At Latitude 52 in Plymouth, Lawray played a key role in the refurbishment of a residential building steeped in maritime heritage, working in close collaboration with our client, Lancer Scott. Originally serving as a sailor’s rest centre, the building was converted in 2004 into 102 apartments, with the addition of two extra storeys. As fire safety regulations and performance standards evolved, a comprehensive upgrade was required to ensure the building remained compliant and fit for the future.
Fire-Safe Cladding Upgrade
Our approach focused on enhancing safety and durability while preserving the building’s distinctive character. Alongside our project partners, we replaced the existing timber cladding with a non-combustible fibre cement weatherboard system, carefully specified to replicate the appearance of natural timber. This solution not only improves fire performance but also increases weather resistance and long-term durability.
Futureproofing Heritage Living
The refurbishment has significantly strengthened the building’s safety profile while maintaining its architectural identity. Latitude 52 now offers residents a façade that is visually striking, compliant, and resilient, demonstrating how considered design and specification can successfully transform and futureproof a legacy residential building.